BMR Construction appointed HPA on a design & build basis to provided detailed design and on-site construction coordination for this new community building for Meads Council.

The surrounding area adjacent to the site suffers from significant deprivation and the Council had a strong desire to provide a facility which could form a focus for the local community. HPA undertook a technical review of the approved planning consented scheme, assisted with the discharge of planning conditions and developed a full construction drawing package. The building was constructed using a SIP panel system, and was successfully completed in 2016.

  • Complete
    2016
  • Contractor
    BMR Construction
  • Cost
    £0.5M
  • Project Type
    Arts & Leisure, Community